Reference Project: Former Laundry

GMRS reference project - Switzerland

Contamination Source
Source of contamination: 900m²
Kf: 10-5m/s; ground water level: 14m u. top ground surface

The Goal
Mass discharge
Time span: 24 months

Thermal remediation of the contamination source
GM Remediation Systems supplied the heating technology to ZÜBLIN Umwelttechnik Ltd

Scope of supply

  • 61 heating systems HEATUp
  • 9 control cabinets HEATHub

Operation and Performance Control
Temperature Data Logger HEAT Log with 512 channels
Database and reporting

Duration
in operation

Altlastensanierung Referenzprojekt Zueblin Schweiz

Join the Conversation

2 Comments

Leave a comment

Deine E-Mail-Adresse wird nicht veröffentlicht.