
Contamination Source
Source of contamination: 900m²
Kf: 10-5m/s; ground water level: 14m u. top ground surface
The Goal
Mass discharge
Time span: 24 months
Thermal remediation of the contamination source
GM Remediation Systems supplied the heating technology to ZÜBLIN Umwelttechnik Ltd
Scope of supply
- 61 heating systems HEATUp
- 9 control cabinets HEATHub
Operation and Performance Control
Temperature Data Logger HEAT Log with 512 channels
Database and reporting
Duration
in operation

Pages: 1 2
I’m not that much of a internet reader to be honest but your sites
really nice, keep it up! I’ll go ahead and bookmark your website to come back
down the road.
Many thanks
Hi, thanks for your kind words!
Best Regards